Week 1 Borehole Install Update 2.5.22

  • Writer: Touba Misk
    Touba Misk
  • May 5, 2022
  • 1 min read

Updated: May 9, 2022

Masjid Al-Khalil - Gunjur - The Gambia

Getting the machines in the works area, ready to drill.

ree

Flushing the water out of the ground, 24m deep (water table in Gunjur 15m), to produce fresh clean water.

Prepping the concrete pads and base for iron welded stand to hold 2000L tank.

ree

Welded stand in place

ree


Finally, fresh water with approximate pH 7.5 (waiting for chemical water tests to confirm)


Water stand erected ready for concrete


ree

2000L tank in situ

ree

Quality checking tank position, including securing solar panel (to stop thievery!), control box and water pressure from pump

Alhamdul'illaah eternal water (inshaAllaah no water bills) flowing from the ground (24 metres)